Staged excavation of a 60 × 80 m pit to 16.8 m, retained by 4 walls (0.8 m thick) and 3 rows of prestressed anchors, in 3 layers of drained Hardening Soil. Inputs follow a published Berlin excavation example, extended to 3D.
●CASE STUDY 01 · 3D EXCAVATION
Anchored excavation, modelled in 3D.
A finite-element model of a 60 × 80 m pit, excavated in stages to 16.8 m and held by 4 walls and 520 prestressed anchors.
- Built the 3D model and its construction phases from published inputs.
- Audited inputs, activation and prestress phase by phase, and corrected the discrepancies found.
- Scripted the runs and post-processing, and compared the results with a published 2D benchmark.
Mirror-wall symmetry, prestress lock-in, anchor equilibrium, a base and a refined mesh, a hydraulic uplift check and the published 2D benchmark. Results are in the table below.
What the model shows.
Method, checks and figures in full: Technical note (PDF) ↗
Largest wall-normal movement at the final stage, measured from the end of wall installation. It includes lowering the water inside the pit to −17.9 m, and is about 0.23 % of the excavation depth.
Peak wall bending moment: the largest strip average (one anchor spacing) along the wall, outside the corner zones, reached in the excavation to −14.35 m (P07). The final-stage value is 625 kN·m/m.
Maximum settlement behind the wall. The trough extends about 2.6 × excavation depth from the wall. Same datum: end of wall installation.
Ground, support, sequence.
Walls, prescribed water heads, excavation lifts and prestressed anchor rows are activated in a fixed order, so the changing support system can be read as a 3D problem.
- Geometry
- 60 × 80 m plan / final excavation 16.8 m
- Support
- 4 walls, 0.8 m thick and 32 m deep · 3 anchor rows · 520 anchors, each with an 8 m grout body
- Ground
- 3 drained Hardening Soil layers, with pit water lowered by prescribed heads
- Stages
- 10 phases · prestress targets 768 / 945 / 980 kN
The results in detail.
More results (5)
The 2D results are shown after the final excavation step without a stated starting point, and the 3D model lowers the pit water in one step, so this is a comparison, not a validation. Source of the 2D curves: Fig. 17–29 of the PLAXIS 3D 2026.1 Material Models Manual (after Schweiger, 2002).
How it was checked.
Of the 28 checks shown, 23 are within tolerance. The 5 misses are reported as they are: the anchor force balance in the three prestressing stages (worst 3.4 % against 1 %), and two wall shear-force peaks near the corners that change by 9.1 % and 16 % between the meshes, so their refined-mesh values are mesh-sensitive.
| # | Check | Result |
|---|---|---|
| 01 | Phase completionEvery construction phase solves on every mesh. | 10 of 10 |
| 02 | SymmetryMirrored walls respond alike; difference in peak deflection. | 0.39 % (worst of the pairs, limit 2 %) |
| 03 | Prestress lock-inInstalled anchor forces hold the targets of 768 / 945 / 980 kN. | all 520 anchors at their target force (largest error 0.0 kN, tolerance 1 kN) |
| 04 | Anchor equilibriumSkin force balances tendon load for all 520 anchors, checked at each phase with anchors; the worst is shown. | FAIL at 3 of 6 phases (worst 3.4 %, limit 1 %) |
| 05 | Mesh comparisonChange in the headline results from the base mesh to the refined mesh (46,476 and 285,191 soil elements). The headline values are from the refined mesh. | Wall movement: converged within 2 % (change 1.1 %) Settlement: converged within 2 % (change 1.9 %) Wall moment: converged within 5 % (change 3.2 %) Wall shear force near the corners: mesh-sensitive, refined-mesh values reported; change 9.1 % in the excavation to −14.35 m (P07) and 16 % in the excavation to −16.8 m (P09) |
| 06 | BenchmarkMidspan wall deflection against the published 2D Berlin results. | 38 mm (from the end of wall installation), 25 mm (from after dewatering); 2D 21–27 mm |
| 07 | Hydraulic upliftSafety ratio at the low-permeability layer at −30 m, from soil weight and water pressure. | 0.97 hand check (soil weight only, wall friction ignored)With wall friction, the 3D model keeps the base in compression; see “More checks”. |
In each prestressing stage some anchors miss the 1 % balance between tendon force and grout skin force, by up to 3.4 %. Every miss sits where the grout reaches its bond limit locally at the start of the bond length, and refining the mesh does not remove them; in the excavation stages that follow, every anchor balances within 1 %.
Full table in the technical note.
More checks (2)
At the end of excavation the soil plug above the low-permeability layer at −30 m weighs slightly less than the water pressure beneath it (ratio 0.97). In the model the walls hold it down by friction: the base stays in compression throughout, rising to about 100–150 kPa near the walls but only 15–24 kPa on average across the central 25 m.
The plug draws 1,040–1,180 kN per metre of wall from friction (base and refined mesh; mesh-sensitive), roughly twice the 570 kN/m the hand check needs with the EN 1997-1 uplift factors. The small margin at the pit centre is the critical point in this model.
Halving or doubling the grout bond limit changes the wall movement, settlement and heave by 2 % or less and the peak wall moment by 5 % or less; even at half the limit the busiest grout body uses only 53 % of its capacity.
- Independent numerical study on inputs from a published example. There is no site investigation, no monitoring data and no calibration to a field case.
- Forces at point-connected anchor heads and re-entrant corners are local peaks that depend on mesh refinement. They are not design actions.
- Pit dewatering is idealised as prescribed water heads, not a simulated pumping system. The model lowers the pit water to its final level in one step before excavation (about 16 mm of the 38 mm wall movement at its largest point); staged lowering could give less.
- The low-permeability layer at −30 m is assumed: the model represents it only through the water pressures (pit water lowered above it, the outside water pressure below), not as a separate soil layer.
- Structural capacity, anchor bond acceptance and global stability were not designed or checked.
- This is not a design and not a professional approval.
- Software
- PLAXIS 3D 2026.1 (26.1.0.211)
- Licence
- Bentley Education (academic)
- Constitutive model
- Hardening Soil, drained
- Support
- Node-to-node tendons and embedded grout bodies
- Calculation
- 10 phases on 2 meshes
- Technical note
- Technical note (PDF) ↗
Computed with PLAXIS 3D 2026.1 · Bentley Education licence