●CASE STUDY 01 · 3D EXCAVATION

Anchored excavation, modelled in 3D.

A finite-element model of a 60 × 80 m pit, excavated in stages to 16.8 m and held by 4 walls and 520 prestressed anchors.

Software
PLAXIS 3D 2026.1
Licence
Bentley Education
Scope
Independent study
Model
3D · 10 phases
Line drawing of a half-model of the anchored excavation cut at midspan: soil layers, retaining walls and rows of ground anchors, with the pit floor outlined in red
What was modelled

Staged excavation of a 60 × 80 m pit to 16.8 m, retained by 4 walls (0.8 m thick) and 3 rows of prestressed anchors, in 3 layers of drained Hardening Soil. Inputs follow a published Berlin excavation example, extended to 3D.

What I did
  • Built the 3D model and its construction phases from published inputs.
  • Audited inputs, activation and prestress phase by phase, and corrected the discrepancies found.
  • Scripted the runs and post-processing, and compared the results with a published 2D benchmark.
How it was checked

Mirror-wall symmetry, prestress lock-in, anchor equilibrium, a base and a refined mesh, a hydraulic uplift check and the published 2D benchmark. Results are in the table below.

01 / Findings

What the model shows.

Method, checks and figures in full: Technical note (PDF) ↗

Peak wall deflection 38 mm

Largest wall-normal movement at the final stage, measured from the end of wall installation. It includes lowering the water inside the pit to −17.9 m, and is about 0.23 % of the excavation depth.

Governing stage 756 kN·m/m

Peak wall bending moment: the largest strip average (one anchor spacing) along the wall, outside the corner zones, reached in the excavation to −14.35 m (P07). The final-stage value is 625 kN·m/m.

Surface settlement 23 mm

Maximum settlement behind the wall. The trough extends about 2.6 × excavation depth from the wall. Same datum: end of wall installation.

02 / The model

Ground, support, sequence.

Walls, prescribed water heads, excavation lifts and prestressed anchor rows are activated in a fixed order, so the changing support system can be read as a 3D problem.

Model recordPLAXIS 3D 2026.1
Geometry
60 × 80 m plan / final excavation 16.8 m
Support
4 walls, 0.8 m thick and 32 m deep · 3 anchor rows · 520 anchors, each with an 8 m grout body
Ground
3 drained Hardening Soil layers, with pit water lowered by prescribed heads
Stages
10 phases · prestress targets 768 / 945 / 980 kN
Axonometric half-model of a rectangular pit cut at its symmetry plane, in three soil layers. Four walls are held by three rows of ground anchors. The pit floor and the excavation depth are drawn in red; water levels are marked.
Model geometryHalf-model cut-away of the rectangular pit at its symmetry plane. Four walls are held by 520 ground anchors in three rows, in layered soil. Groundwater stands lower inside the pit than outside. Schematic, not to scale.
Ten small cross-sections of the east wall, one per phase (P00 to P09). The wall is installed first, then the pit water is lowered; four excavation steps alternate with three anchor rows. Red marks what changes.
Construction sequenceTen calculation phases (P00 to P09) on the east-wall midspan section: initial stresses, wall installation, lowering the water in the pit, then excavation alternating with prestressing of three anchor rows. Red marks what changes in each phase.
03 / Results

The results in detail.

Eight depth profiles of the east wall at midspan: deflection in the top row and bending moment in the bottom row, for four excavation stages. Deflection grows to the final stage; the red moment curve (P07) is the largest.
Wall response at midspanEast-wall midspan deflection and vertical bending moment against depth at four stages of excavation (P03, P05, P07, P09), measured from the end of wall installation (P01). The red curve is the stage with the largest moment (P07).
More results (5)
Left, four settlement troughs against distance from the wall, deepest at the wall. Right, floor heave along two centre lines, fairly even across the floor with small peaks near the walls.
Settlement trough and floor heaveSettlement along the midspan normal of each wall (left) and floor heave along two centre lines (right) at the end of excavation, measured from the end of wall installation (P01). Maximum settlement 23 mm; maximum heave 35 mm.
Three stacked line plots, one per anchor row, of tendon force against position around the pit. Forces stay close to the installation prestress; the highest, about 1,030 kN, is in the deepest row.
Anchor force by positionTendon force of every anchor at the end of excavation, plotted around the pit. Dashed lines show each row's prestress. Forces range from 719 to 1,030 kN; the highest, in the deepest row, is red.
Two line plots of normalised wall movement against distance along the wall, for the long and the short walls. Movement is near zero at each corner and rises to the midspan value over roughly a third of the length.
Corner effect along the wallsWall-normal movement along each wall divided by its midspan value, at the level of maximum deflection, measured from the end of wall installation (P01). Red marks where movement reaches nine tenths of the midspan value.
Left, normalised settlement troughs of the four walls falling to zero about 2.6 excavation depths from the wall. Right, the maximum wall movement and settlement as small percentages of the excavation depth.
Normalised movementsSettlement troughs of the four walls, normalised by their maximum and by the excavation depth; the trough ends at about 2.6 excavation depths. Maximum wall movement is 0.23 % of the depth, measured from the end of wall installation (P01).
Left, wall deflection against depth: the 3D midspan curve reaches about 38 millimetres, above the 2D curves and the measured values. Right, settlement against distance from the wall.
Berlin 2D benchmark and 3D midspan3D wall deflection and settlement against published 2D results: a comparison, not a validation. The 3D maximum is 38 mm from the end of wall installation (P01), 25 mm from after dewatering (P02); 2D results span 21–27 mm.

The 2D results are shown after the final excavation step without a stated starting point, and the 3D model lowers the pit water in one step, so this is a comparison, not a validation. Source of the 2D curves: Fig. 17–29 of the PLAXIS 3D 2026.1 Material Models Manual (after Schweiger, 2002).

04 / Checks

How it was checked.

Of the 28 checks shown, 23 are within tolerance. The 5 misses are reported as they are: the anchor force balance in the three prestressing stages (worst 3.4 % against 1 %), and two wall shear-force peaks near the corners that change by 9.1 % and 16 % between the meshes, so their refined-mesh values are mesh-sensitive.

#CheckResult
01Phase completionEvery construction phase solves on every mesh.10 of 10
02SymmetryMirrored walls respond alike; difference in peak deflection.0.39 % (worst of the pairs, limit 2 %)
03Prestress lock-inInstalled anchor forces hold the targets of 768 / 945 / 980 kN.all 520 anchors at their target force (largest error 0.0 kN, tolerance 1 kN)
04Anchor equilibriumSkin force balances tendon load for all 520 anchors, checked at each phase with anchors; the worst is shown.FAIL at 3 of 6 phases (worst 3.4 %, limit 1 %)
05Mesh comparisonChange in the headline results from the base mesh to the refined mesh (46,476 and 285,191 soil elements). The headline values are from the refined mesh.Wall movement: converged within 2 % (change 1.1 %)
Settlement: converged within 2 % (change 1.9 %)
Wall moment: converged within 5 % (change 3.2 %)
Wall shear force near the corners: mesh-sensitive, refined-mesh values reported; change 9.1 % in the excavation to −14.35 m (P07) and 16 % in the excavation to −16.8 m (P09)
06BenchmarkMidspan wall deflection against the published 2D Berlin results.38 mm (from the end of wall installation), 25 mm (from after dewatering); 2D 21–27 mm
07Hydraulic upliftSafety ratio at the low-permeability layer at −30 m, from soil weight and water pressure.0.97 hand check (soil weight only, wall friction ignored)With wall friction, the 3D model keeps the base in compression; see “More checks”.
A ledger of verification checks in five groups: mesh difference between base and refined mesh, symmetry, prestress lock-in, anchor equilibrium and phase completion, each with its value, tolerance and pass or fail status.
VerificationEvery check quoted on this page, with value, tolerance and status. The misses: anchor force balance at the three prestressing phases (P04, P06, P08) and two corner shear-force peaks that are mesh-sensitive.

In each prestressing stage some anchors miss the 1 % balance between tendon force and grout skin force, by up to 3.4 %. Every miss sits where the grout reaches its bond limit locally at the start of the bond length, and refining the mesh does not remove them; in the excavation stages that follow, every anchor balances within 1 %.

Full table in the technical note.

Native PLAXIS output: total displacementGeometry is drawn 200 times enlarged; colours show the true total displacement |u|. The 44 mm maximum, in the soil just behind the top of a long wall near mid-length, combines about 38 mm of horizontal movement with about 22 mm of settlement at that point.
More checks (2)
Left, bars comparing soil weight and water pressure at the low-permeability layer for two phases. Right, vertical stress against depth at the pit centre: the model total (solid line) and the hand check (circles and grey lines).
Uplift check at −30 mHand check of soil weight against water pressure at the low-permeability layer (−30 m), ratio 0.97, with the model's vertical stress profile at the pit centre.

At the end of excavation the soil plug above the low-permeability layer at −30 m weighs slightly less than the water pressure beneath it (ratio 0.97). In the model the walls hold it down by friction: the base stays in compression throughout, rising to about 100–150 kPa near the walls but only 15–24 kPa on average across the central 25 m.

The plug draws 1,040–1,180 kN per metre of wall from friction (base and refined mesh; mesh-sensitive), roughly twice the 570 kN/m the hand check needs with the EN 1997-1 uplift factors. The small margin at the pit centre is the critical point in this model.

Dumbbell plot of the percentage change of six results when the grout bond limit is halved or doubled, all within a few percent of the base case. Below, a table of grout metrics for the three limits.
Grout bond limit: sensitivity (base mesh)Percentage change of the main results when the grout bond limit is halved or doubled from 500 kN/m (base mesh), and the grout nodes at the limit, capacity share and anchor-balance residual for each limit.

Halving or doubling the grout bond limit changes the wall movement, settlement and heave by 2 % or less and the peak wall moment by 5 % or less; even at half the limit the busiest grout body uses only 53 % of its capacity.

Limitations
  • Independent numerical study on inputs from a published example. There is no site investigation, no monitoring data and no calibration to a field case.
  • Forces at point-connected anchor heads and re-entrant corners are local peaks that depend on mesh refinement. They are not design actions.
  • Pit dewatering is idealised as prescribed water heads, not a simulated pumping system. The model lowers the pit water to its final level in one step before excavation (about 16 mm of the 38 mm wall movement at its largest point); staged lowering could give less.
  • The low-permeability layer at −30 m is assumed: the model represents it only through the water pressures (pit water lowered above it, the outside water pressure below), not as a separate soil layer.
  • Structural capacity, anchor bond acceptance and global stability were not designed or checked.
  • This is not a design and not a professional approval.
Study record
Software
PLAXIS 3D 2026.1 (26.1.0.211)
Licence
Bentley Education (academic)
Constitutive model
Hardening Soil, drained
Support
Node-to-node tendons and embedded grout bodies
Calculation
10 phases on 2 meshes

Computed with PLAXIS 3D 2026.1 · Bentley Education licence